Aberdeen News
Water jetting and vacuumation carried out by Lanes Group plc operatives has cleared a large area of an engineering storage site of waste after drainage channels became blocked. The industrial cleaning project was completed in less than a day, with an estimated five tonnes of waste and water taken away for safe disposal at an…
Drainage engineers from Lanes Group plc have spent a week delivering specialist pipe surveying and cleaning services to customers in Orkney. Customers praised the Lanes team for the support provided to clear a heavily-contaminated pipe, water jet drains around a major reservoir and survey sewers at a new housing estate. Five operatives from the Lanes…
A CCTV camera system designed for surveying sewers has been put to a new use – investigating concerns about a pipe blockage at a gas plant. Drainage engineers based at the Lanes Group plc depot in Aberdeen were called in to survey the gas pipe at the biogas generation plant near Coupar Angus, in Perth…
Things are looking down for the first time in Mark Morrice’s career – and he could not be happier. Mark is the new Area Development Manager at Lanes Group’s Aberdeen depot after he joined the business from a cladding and roofing company. He said: “I had been in that sector since I was 18, so…
It is an industrial drainage pipe renovation programme that can only be achieved with the lightest of touches. When you operate thousands of metres of industrial effluent and water pipes that spread out under a village, through fields, across a river bridge, and under a stream – twice – the last thing you want to…
Facilities managers at a Scottish casino played their cards right by calling in Lanes Group to help them resolve a tricky drainage problem. Internal drainage pipes at the casino were proving susceptible to springing a leak, especially during and after periods of heavy rain. Facilities managers needed a long-term and effective solution to the problem,…
Lanes Group has carried out a major programme of drainage surveying and cleaning as part of a £38 million refurbishment scheme at Aberdeen Royal Infirmary. Drainage engineers from the Lanes Aberdeen depot worked for more than six months on the project, focused on the cleaning of drainage downpipes in the largest building on the Foresterhill…
In the pink with a green car, Regional Manager Stevie Fairbairn, left, hands over the BMW i3 to Operations Supervisor Andy McCormack. Lanes Group plc has taken delivery of its first electric car to support its strategy of delivering sustainable utility wastewater and drainage services. It now has a BMW i3 to support its front-line…