Lanes Group Superflex Recycler tackles rag ball blockage

Lanes Group cleared a major blockage in a mains sewer in south London with a JHL combi Superflex 415 recycler. The machine made light work of the tightly packed rag blockage, which was uncovered by a CCTV survey.

 

After six hours, the blockage was completely cleared from the sewer and the issue was resolved.

 

For a more detailed overview of this project, leave your name and email address and we’ll send the full case study to you.