School drainage repair

Bailey Garner commissioned Lanes Group to carry out a programme of works to fully upgrade the drainage system at The Polesworth School in Warwickshire. Before the upgrade, the school suffered from localised flooding during periods of heavy rain.

 

Our team utilised several methods to tackle the issue, including: pipe scaling, installing patch liners and high pressure jet washing.

 

Download our case study to find out the details of our programme of works and the methods we used.