Tram Track Maintenance

Lanes Group carries out regular maintenance work for Sheffield’s supertram system. The work is essential to reduce instances of localised flooding, which could reduce or even stop services from running completely.

 

The work Lanes carries out takes place twice a year and the team leverage jet vac tanker technology, alongside CCTV surveying, to ensure the local drainage network is in full working order.

 

For a detailed overview of this project, leave your name and email address and we’ll email the full case study to you.