Rail Tunnel Shaft Inspection

Lanes Group leveraged cutting-edge video surveying technology for a rail tunnel shaft inspection in the Ffestiniog Tunnel in North Wales.

 

The technology improves health and safety, as engineers no longer have to abseil through sites like the Ffestiniog Tunnel. CCTV surveys also increase the accuracy of data captured during tunnel inspections.

 

The technology eliminates the need for engineers to abseil through tunnel shafts, therefore improving health and safety and increasing the accuracy of data captured during inspections of tunnels.

 

Find out how Lanes Group undertook this project by filling out the contact form below. Leave your name and email address and we’ll send you a copy of the full case study.