Case Studies
Case Studies by sector:
-
Lanes Group’s Rail Division proved its growing civils maintenance capability with the completion of a complex project to refurbish a footbridge on the London Underground.
-
Network Rail was keen to clear a large culvert under the famous Settle to Carlisle rail line.
-
London Underground (LU) commissioned the Lanes Group Rail Division to paint a large railway bridge on the Jubilee Line in West London.
-
Sheffield’s Supertram system is vital to the smooth operation of public transport in the South Yorkshire city.
-
Taylor Woodrow Alstom were commissioned to carry out Phase 2 of the extension of the Nottingham Express Transit (NET) tramline
-
Civil engineering and transport technology consortium Taylor Woodrow Alstom was commissioned to build a Phase 2 extension of the Nottingham Express Transit tramline.
-
This project involved the relining of surface water sewers along the route of new tracks being built to extend the Metrolink tram network in Greater Manchester.
-
West Acon station on London Underground's Central Line is dominated by a 25 metre high window with 20 reinforced concrete pillars.
-
London Underground (LU) has a list of locations where track drainage failures cause particular problems.
-
A pedestrian bridge used by London Underground (LU) staff needed significant structural repair. There was a risk that pad stands upon which the bridge was standing could become unstable.
-
This busy commuter railway station in West London was in needof a number of key repairs to maintain high standards of structural integrity, safety and customer service.
-
Major drainage problems at Newbury Park Station, in Redbridge, an over-ground section of the Central Line on London’s Tube, threatened to cause serious disruption to train services....
-
London Underground commissioned Lanes Group’s Rail Division to carry out a survey of the roof structure of its engineering depot at Neasden, West London...
-
Lanes Group Rail Division carries out gutter cleaning on buildings, including stations, for London Underground....
-
London Underground commissioned Lanes Group's Rail Division to refurbish a pedestrian bridge over the Northern Line near Finchley Central Station in North London....
-
Farringdon Station, one of the oldest underground railway stations in the world and a Grade II listed building, was being refurbished. A key element of the project was renewal of the glass-covered roof....
-
London Underground (LU) has a large number of rail maintenance buildings. These have many thousands of metres of guttering. LU was keen to have a cost-effective way to maintain these gutters....
-
Our client, Amey, working for Network Rail, needed to carry out a structural survey of one of the deepest rail tunnel ventilation shafts in the UK...
-
A rail line south east of Doncaster was being electrified so freight trains could use it....
-
Lanes Group was commissioned to carry out a major traverse of a culvert linked to the West Coast Main Line in Crewe, Cheshire....
-
Network Rail wished to clear a 50m x 3m stone culvert located under the famous Settle to Carlisle rail line...
-
Bam Nuttall commissioned Lanes Group’s Rail Division to survey nearly 2km of track drainage on the Brighton Main Line in 10 hours....