Rail Culvert Lining

As part of a planned and preventative maintenance, Lanes were commissioned to reline a culvert using a glass reinforced plastic (GRP) Liner on a culvert situated beneath a single-track line running between Glasgow and Fort William.

Due to the Network Rails requirement for a 100-year design life, the culvert was to be rehabilitated using 11mm thickness, of which UV (Ultraviolet) cured in pipe place (CIPP) relining technique was selected to ensure the quality.

To find out more, fill in the form below to request a copy of this case study.