News

Lanes Group helps local church carry out essential repairs

16/04/2015

Lanes Group drainage engineers in Sheffield have joined other contractors in helping carry out essential repairs and refurbishment work on a local church house. The team based at the Lanes depot, in Greenland, donated their time and services free of charge to help Spa View Community Church, in Spa View Road, Hackenthorpe, Sheffield. Lanes drainage…

Lanes supports flexible rail upgrade with drainage survey

16/04/2015

Lanes Group has been called in to survey and clean drains along a railway track as part of a project to increase the capacity of one of the UK’s busiest main rail routes. Its engineers worked with counterparts from Network Rail and Carillion to carry out a detailed survey of track drainage on the Great…

Platform repairs at London Underground station

16/04/2015

Lanes Group has carried out concrete support and platform repairs at Northfields tube station in West London. Piers supporting platforms and nosing stones, which edge the platforms, were repaired at the station on the Heathrow branch of the Piccadilly line. Lanes Group’s Rail Division carry out the work at the station, which is on an…

Lanes launches drone for rail structure inspection

16/04/2015

Lanes Group has carried out the first survey of a London Underground building using an aerial drone. The drainage and maintenance specialist’s rail division carried out the project at the Neasden Lifting Shed in west London. It teamed up with unmanned aerial systems company Unmanned Aerial Technology Ltd to carry out the drone survey, heralding…

Lanes Group completes repairs at Listed Tube Station

14/04/2015

Lanes Group has completed significant repairs at a Grade II Listed underground station in West London. West Acton station on London Underground’s Central Line is dominated by a 25 metre high window with 20 reinforced concrete pillars. Lanes Group’s Rail Division has repaired the concrete pillars, restoring the impressive window to how it looked when…

Lanes gives pedestrians a big lift with repair project

14/04/2015

Lanes Group has carried out major repairs to a pedestrian railway bridge on the London Underground. The bridge across the Central Line at White City, in West London, is used by London Underground workers to reach a signal box and staff accommodation. Regular inspections had established that there was a risk that pad stands, upon…

Lanes saves building merchant cash by curing flood problem

01/04/2015

Lanes Group has cured flood problems that had caused damage worth thousands of pounds at a builder’s merchant yard. Drainage engineers from the Lanes Bristol depot were called in to investigate persistent flooding at the premises run by a national building supplies chain. Lanes Bristol Operations Manager Andy Edwards said: “The flooding was affected the…